About 10,600 results
Open links in new tab
  1. Pages: Off_System_Bridge - wwwsp.dotd.la.gov

    To provide design, detailed plans, and construction for replacement projects with emphasis on meeting the minimum design standards set by the Louisiana Department of Transportation and Development …

  2. DOTD ASSUMES NO LIABILITY IN ANY CONNECTION THERE-WITH, AND ASSUMES NO RESPONSIBILITY TO DISTRIBUTE FUTURE MODIFICATIONS OR CORRECTIONS THAT MAY …

  3. Provide any food, drink, admission, accommodation, travel or gift, regardless of value, to any member of a DOTD project evaluation team (PET), unless specifically authorized in writing in advance by the …

  4. Request_Instructions_06-29-2021Updated 6/29/2021

  5. Prime consultant shall complete the DOTD Form 24-102 without altering the Form’s text; however, the instruction and/or guidance for Sections 12 through 23 can be removed but do not remove Section …

  6. Pages: default

    DOTD has identified approximately 5000 miles of state roads that do not fit the state's role in the highway network. The Program involves transferring these roads, with the money, to local …

  7. If you would like to request a load rating based on the above criteria, please submit the “Bridge Structure Load Rating Request Form” found on the “DOTD Access Only” page of the Bridge Maintenance …

  8. All plans let by DOTD shall be in the DOTD format, regardless of type of project. The complete plan preparation guide may be found in Chapter 8 of Road Design Manual’s, Roadway Design …

  9. The DOTD Bridge Design Section is responsible for the structural design, crashworthiness and Standard Plans for the breakaway ground mounted signs, overhead signs and structure mounted signs.

  10. TEPR FAQ - wwwsp.dotd.la.gov

    Add Filter If I am doing a permit that DOTD will approve, can I submit the Final Report or do I have to submit each recommended deliverable? How long will it take DOTD to review my deliverables?